鲸鱼传媒

POETTKER COMPLETES 2ND PHASE OF THE GATEWAY85 INITIATIVE

 In Distribution & Warehouse
Gateway85 Buildings 4 and 7 | 鲸鱼传媒

鲸鱼传媒 would like to congratulate NorthPoint Development for the completion of phase II of the Gateway85 industrial park in Gastonia, NC. Poettker was selected by NorthPoint as the phase II general contractor. Phase II of the park consists of buildings 4 and 7, encompassing 55 acres and adding an additional 946,000 square feet of industrial warehouse building product to the development. Gateway85 sits on 300-acres just east of Cox Road abutting N.C. 7 to the north and Interstate 85 to the south and will comprise of 3.6 million square feet of industrial warehouse product once fully developed.

Building 4 is a 241,000-square-foot single rear load warehouse with a 36-foot clear height consisting of 22 dock doors that can be expanded to 45. Building 7 is a 705,000-square-foot cross-dock warehouse with a clear height of 40 feet and features 70 dock doors that can be expanded to 140. Preparation of the project consisted of relocating an existing road that goes through the site, associated utility infrastructure extensions to support the development and land development of the 55-acre phase II area.

鈥淭his is an exciting milestone for NorthPoint and 鲸鱼传媒 is appreciative of the opportunity to support them on it鈥 said Keith Poettker, CEO of 鲸鱼传媒 Company. 鈥淭he Southeast market is seeing incredible strength and resilience across many market sectors fueled by continued population growth. In particular, the Charlotte region is evolving into a transportation and logistics industrial hub due to its superior transportation network and we are excited to play a small part in that growth as we continuing to be a resource that industrial developers can trust and rely on to assist them in their construction needs.鈥

Recent Posts
2023 ENR Southeast Top Contractors | 鲸鱼传媒